docketcity.com
AI 15-361

Revision to Shoreline Substantial Development Permit for Overlook Deck (File No. SHOR14-06) Details: The original permit was locally approved October 30, 2014, and was for the purposes of constructing an overlook deck with a path connection to the Washougal River Greenway Trail. The proposed changes to the design of the project are due to budget limitations. Instead of a raised deck, a concrete terrace is proposed. The standards for evaluating revisions to shoreline permits are found within the Camas Shoreline Management Program, Appendix B, Section XIV. The Shoreline Management Review Committee must evaluate the changes to determine if they are within the scope and intent of the original permit. Presenter: Sarah Fox, Senior Planner

Action Item Passed Introduced September 25, 2015
Committee
SHORELINE MANAGEMENT REVIEW COMMITTEE
Requested by
Community Development
Introduced
September 25, 2015
On agenda
September 29, 2015
Passed
September 29, 2015