ID#25-00524
Approve the water main offsets totaling $47,697.10 for the Waukesha Water Utility’s portion of the State DOT project with DF Tomasini, Inc. for the water main lowering on Sunset and STH 59.
- Committee
- Waukesha Water Commission
- Requested by
- Water Utility
- Introduced
- March 17, 2025
- On agenda
- March 20, 2025
- Passed
- March 20, 2025