Approve the updated roadway design parameters for planned 2025 street reconstruction: Morrison Street, from Glendale Avenue to Pershing Street (1,480 ft), be reconstructed with asphalt pavement and concrete curb and gutter. The details of the proposed Morrison Street reconstruction project are as follows: - ELIMINATE previously approved curb extensions (narrowing of the pavement) at Marquette St to serve as traffic calming. - New asphalt pavement and concrete curb and gutter constructed to a width of 27’ from back of curb to back of curb, which is 6’ narrower than the existing street (33’) within this portion of the project. UNCHANGED from previous design approval. - Traffic calming circle constructed at the intersection with Lindbergh Street. UNCHANGED from previous design approval. - Existing on-street parking would be restricted along the west side of Morrison Street, within the project limits. UNCHANGED from previous design approval. DPW staff recommend the above change based on the new Complete Streets Design Guide standards, which were adopted after the referenced design recommendation was made at November 20, 2023 Municipal Services Committee.

Report Action Item Passed Introduced June 5, 2024
Committee
Municipal Services Committee
Introduced
June 5, 2024
On agenda
June 10, 2024
Passed
June 19, 2024

Where it was heard

Common Council Jun 19, 2024 approved Pass Municipal Services Committee Jun 10, 2024 recommended for approval Pass