docketcity.com

Michael Baker Engineering, Inc

Michael Baker Engineering, Inc holds 6 contracts with 1 American local government, carrying $1.95M in stated value. Every figure here links to the government record it was read from.

$1.95MObserved value
6Records
1Governments
Mar 21, 2016First seen
Mar 8, 2021Most recent

Watch Michael Baker Engineering, Inc

Get an email whenever Michael Baker Engineering, Inc turns up in a government record anywhere in the index — a new contract, a renewal, or an award to somebody else. Free for 14 days, no card.

Free for 14 days, no card — and nothing charges itself: at day 14 the emails simply stop unless you choose to subscribe ($19 a month). One email when something matches, and nothing else. Unsubscribe from any of them. Searching stays free — it is public record.

Records

Resolution Authorizing Execution of Contract in the Amount of $717,064.31 to Michael Baker Engineering, Inc. for the Construction Inspections of the Holts Chapel Road and Lowd… $717K Greensboro, NC Jun 23, 2017 contract Construction Resolution Authorizing Execution of Contract in the Amount of $602,553.60 to Michael Baker Engineering, Inc. for the Construction Inspections of the Market Street and Guilford… $603K Greensboro, NC Apr 13, 2017 contract Construction Resolution Authorizing Execution of Contract (2017-022) Amendment, in the Amount of $257,526.76, to Michael Baker Engineering, Inc. for the Construction Inspections of the Mar… $258K Greensboro, NC Apr 1, 2020 amendment Construction Resolution Authorizing Change Order #2 in the Amount of $191,954.40 for Contract 2017-023 (EL-5101DM) with Michael Baker Engineering, Inc. for Additional Construction Inspecti… $192K Greensboro, NC Mar 8, 2021 amendment Construction Resolution Authorizing Change Order #2 in the Amount of $180,585.24 for Contract 2017-0220 (U-5326) with Michael Baker Engineering, Inc. for Additional Construction Inspection… $181K Greensboro, NC Mar 2, 2021 amendment Professional services Resolution Rescinding Council Resolution 085-15 and Authorizing Award of the Downtown Greenway Phase 2e/3a Construction Engineering and Inspections Contract to Michael Baker E… Greensboro, NC Mar 21, 2016 award Construction

Amounts and company names are read automatically from the official record titles. They are accurate often enough to be useful and not often enough to be relied on blindly — every row links to the source document, which is authoritative.

↑ Back to top