24-0279
Consider and take action on a resolution to ratify the contract with D. Wagner Construction Co., Inc. for the emergency repair of the 24-inch gravity sewer (GS) and 20-inch force main (FM) at the Smith Lane Lift Station located at 2850 FM518 in an amount not to exceed $281,004.80 (Director of Public Works)
What this record is
- Held by
- Wagner Construction Co., Inc 7 records across this site
- Amount
- $281K
- Runs until
- no end date published in this record
- Type
- contract
- Field
- Construction
Read automatically from the title of the official record. The source document below is authoritative.
Wagner Construction Co., Inc also holds
Consider and take action on a resolution to ratify the contract with D. Wagner Construction Co., Inc. for the emergency repair of the 24-inch water li… Consider and take action on a resolution ratifying the agreement with D. Wagner Construction Co., Inc. for the Emergency Repair of the 42-inch gravity… Award of Bid No. IFB 25-19 with Wagner Construction, Inc. for the Purpose of the NM State Road 4 16" Water Transmission Line Replacement Project Consider and take action on a resolution to ratify the contract with D. Wagner Construction Co., Inc. for the emergency repair of the 24-inch Ductile … A Resolution of the Board of Trustees of the Town of Erie Approving Change Order No. 1 to the Construction Contract with Wagner Construction, Inc. for…All 7 records for Wagner Construction Co., Inc →
- Committee
- Public Works
- Introduced
- May 28, 2024
- On agenda
- July 9, 2024
- Passed
- July 9, 2024