Planning Commission
Council Chambers
Agenda — 15 items
- 1 Call to Order
- 2 1. Approval of the Minutes from the August 11, 2026 Meeting
- 3 Extension Request
- 4 2. Project: Mishka Vodka Distillery Applicant: Allentown Economic Development Corporation Location: 1932 E. Livingston Street Description: Extension of approval timeline for lot consolidation and construction of a 1-story 15,633 SF manufacturing building and associated improvements File: LMA-2024-00006 / LDC-2024-00003
- 5 Land Developments
- 6 3. Project: 3995 Tilghman Street - Medical Office Building Applicant: Jaindl Land Company Location: 3995 Tilghman Street Description: Redevelopment of an existing restaurant with the proposed construction of a 20,366 SF 2-story medical office building and associated site improvements File: LMA-2026-00008 (Preliminary/Final) Including a waiver from SALDO § 350-13.H - Enhanced Streetscape: § 350-13.H(3) Additional Elements: (a) Pavement Design (b) Street Furnishings (c) Lighting
- 7 4. Project: 360 Lehigh Street - Service Garages Applicant: State Land Holding Company Location: 360 Lehigh Street Description: Construction of a 27,000 SF building with ten (10), 2-story, 2-bay service garages and associated site improvements File: LMA-2026-00010 (Preliminary/Final)
- 8 * Agenda Continues On Second Page *
- 9 5. Project: 2401 W. Emaus Avenue - Data Center Applicant: Quantm Group, LLC Location: 2401 W. Emaus Avenue Description: Amended Preliminary/Final land development application of previously approved plans for a 224,000 SF warehouse building to be revised into a Data Center use, adding an electrical substation, sound attenuation walls and associated site improvements. File: LMA-2022-00010 (Preliminary/Final - Amendment) Including waivers from existing conditions confirmation of SALDO § 350-26 D- No Opening from building shall be less than 1 foot above the curb elevation. § 350-28-C(8)- The bottom of the pond is to be sloped towards the outlet structure § 350-28.E(3)- Storm sewers shall be required to have a minimum diameter of 15 inches and shall be made of reinforced concrete unless otherwise noted by the City Engineer, Sewers shall be installed in sufficient slopes to provide a minimum velocity of 3 feet per second and a maximum of 15 feet per second § 350-32.A- An easement of at least 20 feet in width must be provided along side or rear lot lines, labeled "General Utility Easements"
- 10 Peregrine Tower Has Been Postponed to a Future Meeting
- 11 6. POSTPONED - Project: Peregrine Tower Applicant: Umran Global Investment, LLC Location: 90 S. 9th Street Description: Construction of a 37-story mixed-use apartment building and associated site improvements. File: LMA-2024-00005 (Preliminary/Final)
- 13 Public Comment on Non-Agenda Items
- 14 Adjournment
- 16 !! APPLICANTS ARE REQUIRED TO ATTEND !!
- 17 Questions or Comments? Please call: 610-437-7611 or email: planning@allentownpa.gov
Watch Allentown
This is one agenda. Allentown publishes another every few weeks, and the thing you care about is rarely on the one you happened to find. Name it and we will email you when it appears.
Free for 14 days, no card — and nothing charges itself: at day 14 the emails simply stop unless you choose to subscribe ($19 a month). One email when something matches, and nothing else. Unsubscribe from any of them. Searching stays free — it is public record.