Planning Commission
Council Chambers
Agenda — 12 items
- 1 Call to Order
- 2 1. Approval of Minutes from the Public Meeting of September 8, 2026
- 3 Sidewalk Postponement
- 4 2. Project: 932 Walnut Street Applicant: Barry isett & Associates Location: 932 W Walnut Street Description: Request to postpone requirements of §545-13 for the maintenance and replacement of existing curbs and sidewalks. File: S 26-02
- 5 Land Developments
- 6 3. Bridgeview Academy Additions Applicant: Allentown School District Location: 265 Lehigh Street Description: Construction of a 2-story addition and a gymnasium addition with a pedestrian bridge and associated site improvements. File: LMA-2026-000013 (Preliminary/Final) Waivers requested: from SALDO Streetscape Area Regulations: §350-13.F(1): Alternative Compliance, Timing: An alternative method... such as a fee-in-lieu... may be approved provided pedestrian continuity is provided within no more than one year from completion of construction §350-13.G(2): Street Tree Area: A minimum 4-foot-wide street tree area, between the face of curb and the sidewalk, is required. §350-13.H(1): Minimum Streetscape: Applies all regulations in §13.G. §350-13.H(3)(a): Pavement Design: Paving materials and a pattern is required for each street. §350-13.H(3)(d): Lighting: Both pedestrian and vehicular lighting must be specified and locations and quantities noted.
- 7 4. Project: 2401 W Emaus Avenue - Data Center Applicant: Quantm Group, LLC Location: 2401 W Emaus Avenue Description: Amended Preliminary / Final land development application of a previously approved 224,000 SF warehouse building to be revised into a Data Center use, adding an electrical substation, sound attention walls and associated site improvements. File: LMA-2022-00010 (Preliminary / Final - Amended) - Resubmission Waivers Requested: from existing conditions pending confirmation of SALDO §350-26.D: No opening from building shall be less than 1 foot above the curb elevation. §350-28.C(8): The bottom of the pond is to be sloped towards the outlet structure. §350-28.E(3): Storm sewers shall be required to have a minimum diameter of 15 inches and shall be made of reinforced concrete unless otherwise noted by the City Engineer, Sewers shall be installed in sufficient slopes to provide a minimum velocity of 3 feet per second and a maximum of 3 feet per second. §350-32.A: An easement of at least 20 feet in width must be provided along side and rear lot lines, labeled "General Utility Easements".
- 8 Public Comment on Non-Agenda Items
- 9 Adjournment
- 11 !! APPLICANTS ARE REQUIRED TO ATTEND !! ANY QUESTIONS OR COMMENTS? Call: 610-437-7611 OR email: planning@allentownpa.gov
- 12 Any updates to the agenda may be found at:
- 13 https://allentown.legistar.com/Calendar.aspx
Watch Allentown
This is one agenda. Allentown publishes another every few weeks, and the thing you care about is rarely on the one you happened to find. Name it and we will email you when it appears.
Free for 14 days, no card — and nothing charges itself: at day 14 the emails simply stop unless you choose to subscribe ($19 a month). One email when something matches, and nothing else. Unsubscribe from any of them. Searching stays free — it is public record.