docketcity.com
AHBR 25-1042

2160 Bristol Ct Alterations (Stone and Siding Replacement) Submitted by Jeshua Arlia a) Staff notes a stop work order was issued for the alterations work being done on the property, the proposed stone on the front facade is already installed on the garage mass. b) Section IV-4 of the Architectural Design Standards state that the materials used in any mass must be applied consistently on that mass on all sides of the structure. The proposed alteration would not have materials consistently applied as the stone is proposed to terminate on an outside corner and is not consistent with the existing brick foundation and chimney. c) Staff notes stone material on only the front facade is not atypical for the surrounding neighborhood . The applicant has submitted examples of surrounding properties for consideration.

AHBR Application Failed Introduced August 21, 2025
Committee
Architectural & Historic Board of Review
Requested by
Architectural & Historic Board of Review
Introduced
August 21, 2025
On agenda
August 27, 2025
Passed
August 27, 2025

Where it was heard

Architectural & Historic Board of Review Aug 27, 2025 denied Pass