docketcity.com
AHBR 24-1346

Preserve of Hudson Townhomes New Residential Construction (29 Townhome Units - District 3) Submitted by Hanna Cohan, Knez Homes, Triban Investment a) Staff notes this case was reviewed at the May 8, 2024 and April 9, 2025 meetings. b) The applicant has submitted revisions based on previous board discussions. Revisions include additional variety in dormer design, porch post design, gable end design, and front projection design. c) Staff has compiled the attached redline revisions documenting the observed changes; however, the applicant should present all changes to the board. d) Revise elevations to label exposed foundation material. e) Question the proposed porch width and if it is functional. f) Question if the shake siding along of lot 5 terminates at an inside corner along the left elevation. g) Submit the sign plan on a surveyed site plan. Staff notes the property boundary along Darrow Road is inaccurately depicted on the submitted sign plan.

AHBR Application Agenda Ready Introduced March 3, 2025
Committee
Architectural & Historic Board of Review
Requested by
Architectural & Historic Board of Review
Introduced
March 3, 2025
On agenda
April 9, 2025

Where it was heard

Architectural & Historic Board of Review Mar 12, 2025 continued