docketcity.com
25-4

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE VALLEY VIEW CULVERT REPAIR PROJECT WITH THE LOWEST AND BEST BIDDER. Brief Description: Staff was notified that properties abutting a stream at Valley View Road are prone to flooding during heavy rain events. Upon inspection, it was determined that two failing culverts, measuring 15” and 18”, are located on private property downstream of the culvert under Valley View Road. These culverts obstruct water flow during heavy rainfall, contributing to the flooding issue.

Resolution Passed Introduced December 17, 2024
Committee
City Council
Requested by
Engineering Department
Introduced
December 17, 2024
On agenda
January 21, 2025
Passed
January 21, 2025

Where it was heard

City Council Jan 21, 2025 approved on the consent agenda City Council Workshop Jan 14, 2025 item forwarded