24-60
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH OSBORN ENGINEERING FOR THE VETERAN’S WAY RETAINING WALL FEASIBILITY STUDY. Brief Description: The Veterans Way Retaining Wall Feasibility Study will develop a set of alternative design solutions that will be used to identify the final construction design method to repair a failing retaining wall originally constructed with the Milford Road Connector project located near the Veterans Way railroad overpass.
- Committee
- City Council
- Requested by
- Engineering Department
- Introduced
- April 25, 2024
- On agenda
- May 21, 2024
- Passed
- May 21, 2024