docketcity.com
24-11

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH OSBORN ENGINEERING FOR THE DESIGN OF THE RAVENNA STREET STORMWATER MANAGEMENT IMPROVEMENTS. Brief Description: The purpose of this request for proposal (RFP) was to solicit proposals from professional design, engineering and surveying consultants (Consultant) for the analysis, engineering, and design of the Ravenna Street Stormwater Management Improvements. The project will include the review, analysis of the existing pond volumes and discharges in order to maximize storage in a new regional storm water pond and reduce overland flooding to downstream properties along Ravenna Street. In addition to the project reducing flooding to properties on Ravenna Street, the site is located upstream of the Barlow Community Center Dams which will help with flood control for downtown properties.

Resolution Passed Introduced January 10, 2024
Committee
City Council
Requested by
Engineering Department
Introduced
January 10, 2024
On agenda
February 6, 2024
Passed
February 6, 2024

Where it was heard

City Council Feb 6, 2024 to suspend the rule requiring three readings Pass City Council Feb 6, 2024 adopted Pass City Council Workshop Jan 23, 2024 item forwarded