docketcity.com
26-0105-040826

UC-26-0105-I I5 MOUNTAIN, LLC: USE PERMIT for public utility structures (utility poles, public utility buildings and structures, including an electric substation, and aboveground utility lines located outside the existing aboveground utility corridor). WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; 2) eliminate and reduce street landscaping; 3) eliminate parking area landscaping; 4) reduce buffering and screening; 5) increase retaining wall height; 6) reduce gate setback; 7) increase the parking aisle length; 8) allow modified driveway standards; and 9) waive full off-site improvements. DESIGN REVIEW for public utility structures, including a data center with electric substation and other ancillary structures, rerouted aboveground utility lines, and new utility poles on 55.10 acres in an IP (Industrial Park) Zone within the Airport Environs (AE-60) Overlay. Generally located south of Serene Avenue and east of Decatur Boulevard within Enterprise. JJ/rr/kh (For possible action)

Routine Item Agenda Ready Introduced March 31, 2026
Committee
Clark County Zoning Commission
Introduced
March 31, 2026
On agenda
April 8, 2026

Where it was heard

Clark County Zoning Commission Apr 8, 2026