docketcity.com
26-0075-040826

UC-26-0075-USA: USE PERMITS for the following: 1) a proposed large-scale electric generation (solar); 2) proposed public utility structures (electric substation; Battery Energy Storage System (BESS) facility; utility poles; and overhead transmission lines) and all ancillary structures; and 3) a proposed communication tower and all associated equipment. WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; 2) eliminate buffering and screening; and 3) modify residential adjacency standards. DESIGN REVIEWS for the following: 1) a proposed large-scale electric generation (solar); 2) proposed public utility structures (electric substation; Battery Energy Storage System (BESS) facility; utility poles; and overhead transmission lines) and all ancillary structures; and 3) a proposed communication tower and all associated equipment on a 5,131.70 acre portion of a 9,661.40 acre site in an RS80 (Residential Single-Family 80) Zone and an H-2 (General Highway Frontage) Zone. Generally located south of US Hwy 95 and west of Sky Road (alignment) within Northwest County. AB/md/kh (For possible action)

Non-Routine Item Agenda Ready Introduced March 31, 2026
Committee
Clark County Zoning Commission
Introduced
March 31, 2026
On agenda
April 8, 2026

Where it was heard

Clark County Zoning Commission Apr 8, 2026 Approved Pass