24-400137-012225
ET-24-400137 (UC-2093-96)-CAPSTONE CHRISTIAN SCHOOL: USE PERMITS SEVENTH EXTENSION OF TIME to complete the following: 1) a temporary batch plant; and 2) additions to an existing temporary sand and gravel mining (gravel pit) operation including temporary associated equipment storage and stockpiling areas all in conjunction with a previously approved, privately funded storm water detention basin and future construction projects. VARIANCES for the following: 1) permit a previously approved, privately funded, below grade storm water detention basin; and 2) permit a temporary construction trailer on 40.38 acres in a PF (Public Facility) Zone. Generally located on the north side of Cactus Avenue, 900 feet east of Amigo Street within Enterprise. MN/nai/kh (For possible action)
- Committee
- Clark County Zoning Commission
- Introduced
- January 8, 2025
- On agenda
- January 22, 2025