docketcity.com
24-3967

ORDER approving twenty (20) MOUs for the following ARPA MCWI grant agreements between the Board of Supervisors and County staff as appropriate, and authorizing all parties to execute the documents. · 67-2-CW-5.5 Tradition Regional Pump Station · 341-2-DW-5.15 Canal Road Water Connector · 342-2-CW-5.5 Flatbranch Regional Pump Station · 343-2-CW-5.5 Beatline Road Low Pressure Sewer System · 344-2-CW-5.5 Pineville Area Sewer Extension · 345-2-CW-5.5 Firetower Road Sewer, Including Connection from Pecan Grove Landfill Leachate Collection · 346-2-DW-5.15 Firetower Road Water Transmission Main · 347-2-CW-5.5 County Farm and Landon Rd Sewer · 348-2-CW-5.5 Sewer to the East side of Canal Road, between I-10 and Landon Road · 349-2-SW-5.6 White Plains Road elevation - Drainage and Flood Access · 350-2-SW-5.6 N. Carr Bridge Road elevation - Drainage and Flood Access · 351-2-SW-5.6 Turkey Creek Drainage Improvements · 352-2-CW-5.5 Superior Utilities Lagoon Pump Station · 355-2-DW-5.15 River Hills Elevated Storage Tank or North South Water System Loop · 375-2-DW-5.15 Espy Ave Elevated Storage Tank · 376-2-CW-5.5 Kiln-Delisle Sewer · 379-2-CW-5.5 Menge Ave Sewer · 380-2-SW-5.6 Bells Ferry Road Elevation · 382-2-SW-5.6 Herman Ladner Road Elevation - Drainage and Flood Access · 384-2-SW-5.6 Beach Outfall Repair & Upgrades

Order Passed Introduced August 6, 2024

What this record is

Held by
Pecan Grove Landfill Leachate Collection 2 records across this site
Runs until
no end date published in this record
Type
amendment
Field
Construction

Read automatically from the title of the official record. The source document below is authoritative.

Pecan Grove Landfill Leachate Collection also holds

ORDER spreading upon the minutes the following executed ARPA MCWI Grant Agreements between the Board of Supervisors and County staff as appropriate, a… Harrison County, MS
Committee
Chancery Clerk
Introduced
August 6, 2024
On agenda
August 12, 2024
Passed
August 12, 2024