15-4117
Submitting report relative to Supplemental Report on Demolition Standards and Land Use. (The proposed code change would allow for demolition contractors to use the crushed foundation of the demolished dwelling as part of the material to refill the hole. The demolition contractor would be able to place 40-100% rock, concrete, brick, block, or masonry, crushed between 1.5 and 8 inches in diameter, up to 6 inches below grade, the top six inches is only required to be filled with clean soil.) (REFERRED TO THE PUBLIC HEALTH AND SAFETY STANDING COMMITTEE ON 9-26-16)
- Committee
- Public Health and Safety Standing Committee
- Introduced
- November 2, 2016
- On agenda
- September 26, 2016