docketcity.com

Architectural Commission

March 25, 2026 Final

Agenda — 1 item

  1. ARC-25-0050 (ZON-25-0049) 180 ROYAL PALM WAY, 301-309 S COUNTY RD AND 155-7 BRAZILIAN AVE. (COMBO) The applicant, FG Palm Beach Fund LLC and EYE MAN Limited Partnership & TAU Mid Partnership LLP, has filed an application requesting Architectural Commission review and approval for the renovation and exterior alterations to façades of the existing three-story office bank building and the conversion of two floors into residential use; the demolition of existing parking lots and the construction of a new second floor addition with second floor residences, to an existing one-story commercial building at 301 S County Road and demolition and new buildings on Brazilian Ave including on-site parking, site plan and landscape change, including variances to exceed maximum building length, floor area, and reduced drive aisle widths. The Town Council shall review the application as it pertains to zoning relief/approval. This item has been withdrawn by the applicant.

Watch Palm Beach

This is one agenda. Palm Beach publishes another every few weeks, and the thing you care about is rarely on the one you happened to find. Name it and we will email you when it appears.

Free. One email when something matches, and nothing else. Unsubscribe from any of them.

↑ Back to top