CECASE-26-03353
(GO), Robert & Karen Ruybal (Co-TTEEs), Robert E Ruybal and Karen M Ruybal Revocable Trust, 4805 Germany Avenue 42-24(a)(1)(b) NPCC - Maintenance of stormwater drainage area (Rock and rubber barrier covering culvert. Needs to be removed from culvert to main road and needs to be seeded or sodded.) 42-24(a)(1)(a) NPCC - Maintenance of stormwater drainage area (Culvert blocked by rock and rubber barrier.) 70-21 NPCC - Driving through right-of-way (Visible tire tracks through the right-of-way/swale into carport on side lot.) Section 2.2.5 ULDC - Certificate of Zoning Compliance (PCZC required for culvert and driveway/apron to drive through the right of way continue traversing into side lot. PCZC required for shed on side lot. PCZC required for carport on side lot. PCZC required for accessory structure built in the rear of property. PCZC required for roof extension onto accessory structure. PCZC required for roof built on boat dock after the fact.)
- Committee
- Code Enforcement Hearing
- Requested by
- General Services
- Introduced
- October 7, 2026
- On agenda
- December 10, 2026
Watch North Port
Say what matters to you — a street, a company, a subject — and we will email you when North Port files something about it.
Free for 14 days, no card — and nothing charges itself: at day 14 the emails simply stop unless you choose to subscribe ($19 a month). One email when something matches, and nothing else. Unsubscribe from any of them. Searching stays free — it is public record.