CECASE-26-02543
(JP), Rising Investments Inc, 1846 Kirkwood Street ULDC A.1.1.2 - Erosion control (The silt fence is down in the front and sides of property.) 42-23 NPCC - Accumulation of debris (Accumulation of debris on property, consisting of waste construction material and garbage.)
- Committee
- Code Enforcement Hearing
- Requested by
- General Services
- Introduced
- August 14, 2026
- On agenda
- September 24, 2026