docketcity.com
CECASE-24-4117

Louis Cerbone:PASHCHUK VLADIMIR;:5302 Bayberry St North Port, FL 342866345:4.5.3 (D) ULDC, Land Clearing Debris. (1). No land clearing debris shall be allowed to be placed or stored within 25-feet of the front, side, and rear property lines of the site under the following conditions: a. The debris is piled together in one (1) single mass in only one (1) location on the site. b. The pile of debris shall not exceed 6-feet in height. c. The pile of debris shall be completely enclosed on all four (4) sides by a solid, non-opaque 6-foot high fence and shall include a gate for Fire Department access. d. No burning of debris shall occur unless a valid permit has been secured from State, County and/or local jurisdictions where appropriate. (2). For all land clearing debris that won’t be stored on the site under the conditions set forth above, said debris shall be removed completely from the site within 30-days of having been cleared. (3). Trees that are felled in the process of land clearing, may be mulched, and spread over the site, but shall not be buried in bulk. The mulched material may not be used to build a permanent berm. Land clearing debris in any form may not be used for a business operation from the project site.:Land clear without permit.;

1st Hearing Case Passed Introduced January 17, 2025
Committee
Code Enforcement Hearing
Requested by
General Services
Introduced
January 17, 2025
On agenda
March 27, 2025
Passed
March 27, 2025

Where it was heard

Code Enforcement Hearing Feb 27, 2025