15-8697
Report from TetraTech Engineering, Engineer of Record for the Phase 4B Lake Monroe Intake, Pump Station and Raw Water Transmission Main project. - Phyllis Wallace, Interim Public Works Director (386) 878-8965. Strategic Goal: Infrastructure
- Committee
- City Commission
- Introduced
- April 10, 2024
- On agenda
- April 15, 2024