Proposed Project: Related applications on a 45.6-acre site: USE PERMIT: to demolish an existing recreation center, surface parking lot, and six-level parking structure to allow a new 592,567 square-foot research and development (R&D) building along Central Expressway; demolition of four buildings (928 East Arques Avenue, 242 Commercial Street, 230 Commercial Street, and 222 Commercial Street) to allow for a new seven-story parking structure along Commercial Street; demolition of one building at 930 East California Avenue to allow for the expansion of an existing PG&E electrical substation; and installation of associated site improvements around the proposed R&D building and parking structure. The site would retain four existing industrial/office/R&D buildings, including an office building (930 East Arques Avenue), Building 81 (974 East Arques Avenue), Building 85 (978 East Arques Avenue), and a central utility plant. The project includes merging seven existing lots to form a larger campus parcel, with one existing lot remaining at 222 Commercial Street. VARIANCE: to exceed the maximum height limit and floor plate sizes specified in the Arques Campus Specific Plan. Location: 974 East Arques Avenue (APNs: 205-36-006, -007 and -008); 928-930 East Arques Avenue (APN: 205-35-017); 222, 230 and 242 Commercial Street (APNs: 205-35-006, 007 and 008, respectively) and 930 East California Street (APN 205-35-003). File #: PLNG-2023-0134 Zoning: M-S Applicant / Owner: Applied Materials (Applicant/Owner) Environmental Review: An addendum to the Arques Specific Plan EIR and the Land Use and Transportation Element (LUTE) Update EIR has been prepared pursuant to CEQA Guidelines Sections 15162 and 15164. Project Planner: Cindy Hom, Associate Planner (408) 730-7411, chom@sunnyvale.ca.gov

Report to Board/Commission Passed Introduced March 3, 2024
Committee
Planning Commission
Requested by
Community Development Department
Introduced
March 3, 2024
On agenda
April 22, 2024
Passed
April 22, 2024

Where it was heard

Planning Commission Apr 22, 2024 approved Pass