Consider recommendations regarding Award of Contract for Maria Ygnacio Bike Path Storm Repairs Project, County Project No. 25STM3-2N04; Second District, as follows: (4/5 Vote Required) a) Approve the Project Plans and Specifications, on file in the Public Works Department Office, located at 123 E. Anapamu Street, Santa Barbara, CA 93101, for the construction of the Maria Ygnacio Bike Path Storm Repairs Project; County Project No. 25STM3-2N04; b) Award the Construction Contract for the Maria Ygnacio Bike Path Storm Repairs Project in the amount of $563,965.00 to the lowest responsible bidder, Matcon General Engineering, Inc., 531 Magnolia Avenue, Corona, CA 92879, subject to the provisions of documents and certifications, as set forth in the Specifications applicable to the Project, as required under California law; c) Approve and authorize the Chair to execute the Construction Contract, which has been reviewed and approved by County Counsel, Auditor-Controller, and Risk Manager, or their authorized representatives; d) Authorize the Public Works Director, or designee, to approve change orders for the Maria Ygnacio Bike Path Storm Repairs Project for a contingency amount up to $44,898.00 plus an additional amount of up to $84,000.00 for supplemental work items, for a total of not to exceed authorization amount of $692,863.00; e) Find that the Maria Ygnacio Bike Path Storm Repairs Project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to 14 CCR section 15301(c) as the proposed project(s) consists of the operation, repair, maintenance, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that previously existing, including but not limited to existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities. Find that the project is also an emergency repair project and is exempt from the provisions of the CEQA pursuant to State CEQA Guidelines Section 15269(d), as this project will fix or restore existing highway and roads damaged by natural disasters and will be initiated within one (1) year of the damage occurring. A Notice of Exemption was filed on this basis on January 7, 2026, and the proposed action is within the scope of that Notice of Exemption; and f) Approve Budget Revision Request No. 1677 to establish Fiscal Year 2026-2027 appropriations by $692,863.00 in Public Works Roads-Operations Fund (Fund 0015) for Services and Supplies, funded by an operating transfer from the Roads-Measure A Fund. Establish appropriations of $692,893.00 in the Public Works Roads-Measure A Fund for Other Financing Uses funded by a release of Restricted Measure A South Fund Balance.

Administrative Item Agenda Ready Introduced September 11, 2026

What this record is

Held by
Matcon General Engineering, Inc 2 records across this site
Amount
$564K
Runs until
no end date published in this record
Type
award
Field
Construction

construction contracts in CA that end within a year →
Governments publish the end date in the award. That date is when the work goes back out to bid, and it is usually stated years ahead.

Read automatically from the title of the official record. The source document below is authoritative.

Matcon General Engineering, Inc also holds

Accept Lowest Responsive and Responsible Bid and Award Construction Contract to Matcon General Engineering, Inc. in the Amount of $329,095.07 for the … $329K Huntington Beach, CA
Committee
BOARD OF SUPERVISORS
Introduced
September 11, 2026
On agenda
September 22, 2026

Where it was heard

BOARD OF SUPERVISORS Sep 22, 2026

Watch what Santa Barbara County buys

This is one award. Santa Barbara County signs them continuously, and each one names a company and a date it runs out. Say what you sell and we will email you when the next one matches.

Free. One email when something matches, and nothing else. Unsubscribe from any of them.

↑ Back to top