26-00547
Consider recommendations regarding Amendment No. 5 to Cachuma Lake RV Site Renewal Construction Contract, as follows: a) Approve and authorize the Chair of the Board of Supervisors to execute Amendment No. 5 to Board Contract 23168 with Marcon Engineering, Inc. (Agreement) for the construction of the Cachuma Lake RV Site Renewal Project (Project) extending the Contract Term through December 31, 2026; and b) Determine that the Project continues to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the State Guidelines for the Implementation of CEQA which consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and have substantially the same purpose and capacity as the structure replaced; CEQA Guidelines Section 15301 which consists of the repair or minor alteration of existing facilities or topographical features, involving negligible or no expansion of existing use; and CEQA Guidelines Section 15304(b) which consists of minor alterations in the condition of land, water, and/or vegetation, including the replacement of existing conventional landscaping with water efficient landscaping, which do not involve removal of healthy, mature, scenic trees, and that a Notice of Exemption on these bases was approved by the Board on October 10, 2023 and filed.
What this record is
- Held by
- Marcon Engineering, Inc 8 records across this site
- Runs until
- December 31, 2026 121 days — goes back out to bid date quoted from the award document
- Type
- amendment
- Field
- Construction
See everything else expiring in this field →
Read automatically from the title of the official record. The source document below is authoritative.
Marcon Engineering, Inc also holds
Consider recommendations regarding Amendment No. 4 to the Cachuma Lake RV Site Renewal Construction Contract, as follows: (4/5 Vote Required) a) Appro… Consider recommendations regarding a Third Amendment to the Cachuma Lake Recreational Vehicle (RV) Site Renewal Construction Contract, Third District,… Consider recommendations regarding a Second Amendment to Cachuma Lake Recreational Vehicle (RV) Site Renewal Construction Contract, as follows: a) App… Consider recommendations regarding a Statement of Final Quantities for the San Ysidro Debris Basin Improvement Project, First District, as follows: Ac… Consider recommendations regarding a First Amendment to Cachuma Lake RV Site Renewal Construction Contract, as follows: a) Approve, ratify, and author…All 8 records for Marcon Engineering, Inc →
- Committee
- BOARD OF SUPERVISORS
- Introduced
- June 12, 2026
- On agenda
- June 23, 2026
- Passed
- June 23, 2026