Consider recommendations regarding Buena Vista Debris Basin Project, First District, as follows: Acting as the Board of Directors, Flood Control and Water Conservation District: a) Approve and authorize the Chair to execute the Agreement for Services of Independent Contractor with HDR Engineering Inc. to provide engineering services during construction for the Buena Vista Debris Basin Project, for the period of September 17, 2024 through December 31, 2026 in an amount not to exceed $124,116.23; b) Approve and authorize the Public Works Director, or designee, to make immaterial changes in accordance with Section 48 of the Agreement for Services of Independent Contractor with HDR Engineering Inc, to make amendments to the Agreement in an amount not to exceed $12,411.62 and to extend the term of the Agreement by up to one-year to complete the work within the scope of the Agreement; c) Determine that the Buena Vista Debris Basin Project to be carried out is for the benefit of a single zone; and d) After considering the Mitigated Negative Declaration (MND) and Findings for the Buena Vista Debris Basin Project, adopted by the Board of Directors as Lead Agency on February 28, 2023, and the discussion included herein, find that pursuant to California Environmental Quality Act (CEQA) Section 15162, no substantial changes are proposed, and there are no substantial changes in circumstances or new information of substantial importance regarding significant impacts or feasibility of mitigation measures and alternatives, and therefore the recommended actions are within the scope of the project covered by the aforementioned environmental documents and no new environmental document is required.
What this record is
- Held by
- HDR Engineering Inc 138 records across this site
- Amount
- $124K
- Runs until
- December 31, 2026 121 days — goes back out to bid date quoted from the award document
- Type
- amendment
- Field
- Construction
See everything else expiring in this field →
Read automatically from the title of the official record. The source document below is authoritative.
HDR Engineering Inc also holds
Amendment 2 to the Public Contract for Services with HDR Engineering, Inc. for the Hilltop Road Improvement Project - Segment 2, in the Amount of $150… Request for approval to execute an agreement with HDR Engineering, Inc. in the amount of $154,598.00, for Professional Engineering Services in connect… Consider recommendations regarding awarding a Contract to HDR Engineering, Inc. for Construction Support Services on County Project No. 720864 Santa C… Dept/ Agency: Water and Sewer Utilities Action: (X) Ratifying (X) Authorizing ( ) Amending Type of Service: Professional Services Contract Purpose: To… Approve and authorize Amendment No. 6 to Agreement No. 220223B (FC) with HDR Engineering, Inc., increasing the maximum from $17,846,772 to a new total…All 138 records for HDR Engineering Inc →
- Committee
- BOARD OF SUPERVISORS
- Introduced
- September 5, 2024
- On agenda
- September 17, 2024
- Passed
- September 17, 2024