docketcity.com
25-1945

E&P TECHNOLOGY WAY - BUILDINGS A & B / DENNIS PAULLEY / USE PERMIT APPLICATIONS #P22-00307 and #P22-00308 CEQA Status: Consideration and possible adoption of a Mitigated Negative Declaration. According to the proposed Mitigated Negative Declaration, the proposed project would not have any potentially significant environmental impacts after implementation of mitigation measures. Mitigation measures are proposed for the following areas: Biological Resources, Cultural Resources, and Transportation. The project site is not included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. (State Clearinghouse Number #2024100855) 2024100855) Request: Approval of two separate Use Permit applications to allow the construction of two separate projects and buildings: Building A - a 450,000 gallon per year wine production and storage facility within a proposed 143,312 sf building (P22-00307-UP) and Building B - speculative warehouse/office uses within a proposed 66,915 sf building (P22-00308-UP). The Building A project proposes winery uses that will include grape crushing, bulk wine processing and storage, stainless steel tank and barrel storage, bottling, and office space. In addition, approximately 13,000 sf of covered outdoor work area will be located on the north side of the building. The proposal also includes 129 parking spaces and eight (8) spaces for semi-trailers. Access will be provided by three (3) new driveways; one (1) on Technology and two (2) on Morris Court. Tours, tastings, and marketing events are not proposed with this application and will not occur as part of this permit. The applicant is also requesting a variation to the development regulations of the Specific Plan to reduce the required 40-foot average building setback along the south property line to approximately 31-feet. The Building B project proposes to allow warehouse and office uses within the proposed 66,915 sf building. The proposal also includes 82 parking spaces. Access will be provided via two (2) new access driveways off Technology Way on the far west and east sides of the project site. The warehouse uses are consistent with allowable warehouse uses as outlined in Napa County Code Industrial Park zoning district (18.40.020) and the Napa Valley Business Park Specific Plan (NVBPSP.) The City of American Canyon will provide both projects with water service . Napa Sanitation District (NSD) will provide sewer. Both buildings will be sprinklered for fire protection. There are three parcels comprising the two project sites: Building A is proposed on a 13.2-acre parcel on the north side of Technology Way and Morris Court (APN 057-250-030) and Building B is proposed on a 6.87-acre project site on the north side of Technology Way, opposite Gateway Road West (APN’s 057-250-031& -032), which will be merged as required by a condition of approval. Both sites are located in the NVBPSP area within the IP:AC (Industrial Park: Airport Compatibility) Zoning District. Staff Recommendation: Adopt the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program and approve the Use Permit with the proposed conditions of approval. Staff Contact: Sean Kennings, Contract Planner, (415) 533-2111, or sean@lakassociates.com Applicant Contact: Mike Kelley, 5150 Fair Oaks Blvd, Suite 101-219, Carmichael, CA 94608, (916) 956-0524 CONTINUED FROM THE NOVEMBER 20, 2024, PLANNING COMMISSION MEETING.

Public Hearing Agenda Ready Introduced November 18, 2025
Committee
Planning Commission
Requested by
Planning, Building and Environmental Services
Introduced
November 18, 2025
On agenda
December 3, 2025
Passed
December 31, 2025

Where it was heard

Planning Commission Dec 3, 2025