Agenda — 1 item
- Request to approve a 400-megawatt (MW) battery energy storage system (BESS) on 15.94 acres located at 13620 Live Oak Lane in the Irwindale Gateway Specific Plan (IGSP). The request also includes the construction of 1,200 square foot operations and maintenance building, on-site collector substation, overhead electrical tie-line, and a 130’-0” Point of Change of Ownership (POCO) pole for property located at 13620 Live Oak Lane