docketcity.com
24-817

Earley Farms, LLC, Conditional Use Permit Assessor Parcel Numbers (APN’s) 217-251-003, 217-244-004, 217-244-007 & 217-225-007 Record No.: PLN-12705-CUP Blocksburg area A Conditional Use Permit for authorizing the continued operation of pre-existing commercial cannabis cultivation on a parcel where approximately 68,000 square feet of area was historically used for outdoor cultivation and approximately 4,400 square feet of area was used for mixed light cultivation operated from the property since prior to 2016. Under the Use Permit, one (1) acre of the prior outdoor cultivation is proposed to be continued and the 4,400 square feet of Mixed-Light Cultivation will instead be operated in an Outdoor fashion, for a combined total of approximately 47,560 square feet of outdoor cultivation. Cultivation activities are proposed to be removed and relocated from three existing sites and consolidated within two distinct areas on the property. The three former sites are proposed to be fully remediated following removal of all cultivation infrastructure. Cultivation will continue to occur primarily in pots, within a series of approximately 22 greenhouses, each approximately 20 feet in width and of varying lengths. Light deprivation techniques will be used to induce early flowering and allow for a total of 2 harvests per year in each of the greenhouses. Juvenile cannabis plants will be supplied to the property twice a year delivered from an off-site licensed nursery. Two (2) greenhouses (each approximately 2,000 square feet in size) are proposed to be constructed and will primarily be used as propagation areas to help mature juvenile plants used during the second cultivation cycle. No supplemental lighting or generators are used as part of the cultivation and propagation activities. Annual estimated water usage for cultivation is 687,000 gallons and all water for irrigation is provided by an existing off-stream rainwater catchment pond with approximately 2,000,000 gallons of storage. Initial processing and drying of the harvest occurs within two existing barns and further processing occurs off-site. All cultivation operations are conducted by the property owner and their family.

Resolution Passed Introduced April 24, 2024
Committee
Planning Commission
Introduced
April 24, 2024
On agenda
May 2, 2024
Passed
May 2, 2024

Where it was heard

Planning Commission May 2, 2024 approved