26-0631
Three-Year Term Contract with Two-Year Renewal Options for Electric Substation Infrastructure Work for the Energy Resources Department (Sole Source) (Citywide) This contract is for specialized substation engineering, construction support, and technical services for the expansion, modification, and integration of electric substation infrastructure. Work includes coordination with existing substation design standards, protection and control schemes, equipment layout, and system integration to ensure compatibility with the City's current substation fleet and operational practices. The Energy Resources Department and Procurement Services recommend awarding the contract to the sole source vendor, Reinhausen Manufacturing Inc., in an amount not to exceed $1,000,000 annually, with an annual increase allowance of up to 5% or the adjusted Consumer Price Index.
What this record is
- Held by
- Reinhausen Manufacturing Inc
- Amount
- $1.00M
- Runs until
- June 30, 2029 3 years away calculated from the contract term stated in the record
- Type
- award
- Field
- Utilities & energy
See everything else expiring in this field →
Read automatically from the title of the official record. The source document below is authoritative.
- Committee
- City Council
- Introduced
- June 30, 2026
- On agenda
- August 17, 2026