16-154
Hydrology Study and Stormwater Drainage Policy PURPOSE: The purpose of this item is to receive the results of preliminary engineering hydrologic studies related to drainage concerns in three areas of Town. This item will also present the Board of Alderman with the Town’s current drainage policy as adopted by the Town on June 12, 1984.
- Committee
- Board of Aldermen
- Introduced
- May 11, 2016
- On agenda
- May 17, 2016