{"vendor":"HDR Engineering, Inc","vendor_slug":"hdr-engineering","n":193,"total":599015096.42,"governments":75,"url":"https://www.docketcity.com/vendors/hdr-engineering","results":[{"title":"<span data-olk-copy-source=\"MessageBody\" data-pasted=\"true\">Consider and take appropriate action on Task Order No. 3 with HDR Engineering, Inc. for Basis of Design (BOD) services for the Hilltop Water Treatment Plant, Collaborative Delivery Evaluation Services, and 30% Design Documents in an amount not to exceed $2,750,000.","government":{"name":"Mineral Wells","state":"TX"},"action":"contract","category":"professional-services","amount":2750000,"vendor":"HDR Engineering, Inc","date":"2026-10-20","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/mineral-wells/meeting/394097#item-2114001"},{"title":"Approval of a Task Order to HDR Engineering, Inc for the Preliminary Engineering for Alterations to the Chowan Creek Bridge Approaches ($212,630)","government":{"name":"Beaufort County","state":"SC"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-10-12","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/sc/beaufort-county/meeting/362291#item-1951048"},{"title":"Approval of Professional Services Agreement with HDR Engineering, Inc. (Columbus, OH) for the Fiscal Year 2024 Safe Streets and Roads for All Implementation Project (Education and Outreach)","government":{"name":"Lucas County","state":"OH"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-10-06","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/oh/lucas-county/meeting/339288#item-1986765"},{"title":"Consider authorizing a Professional Services Agreement with HDR Engineering, Inc., to provide engineering services associated with the Polly Ranch Asphalt Rehabilitation Project.","government":{"name":"Friendswood","state":"TX"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-10-05","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/friendswood/meeting/383875#item-1888002"},{"title":"Change Order #8 - HDR Engineering, Inc. (Landfill Gas Operations & Maintenance), Contract No. 22249","government":{"name":"Rowan County","state":"NC"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-10-05","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/nc/rowan-county/meeting/316907#item-2028928"},{"title":"Approval of Task Order TR-HDR-CIPS23-019-01 with HDR Engineering, Inc., for the Phase 1 engineering and design consulting services for the San Gabriel Parkway West roadway project (CIP T.42), in an amount not to exceed $1,051,324.00; and authorize the City Manager to execute any and all necessary documents.","government":{"name":"Leander","state":"TX"},"action":"contract","category":"professional-services","amount":1051324,"vendor":"HDR Engineering, Inc","date":"2026-10-01","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/leander/meeting/391295#item-1938559"},{"title":"ORDINANCE appropriating $1,050,000.00 out of Dedicated Drainage and Street Renewal Capital Fund - Drainage Charge; approving and authorizing Professional Engineering Services Contract with HDR ENGINEERING, INC for Negotiated Work Orders for Pre-Engineering of Storm Water Drainage Planning; providing funding for CIP Cost Recovery relating to construction of facilities financed by the Dedicated Drainage and Street Renewal Capital Fund - Drainage Charge","government":{"name":"Houston","state":"TX"},"action":"amendment","category":"construction","amount":null,"vendor":"HDR Engineering","date":"2026-09-30","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/houston/meeting/127396#item-1858028"},{"title":"Staff report submitted with one request for action. Motion to approve a task order in the amount of $96,815 from HDR Engineering for Right of Way Acquisition Service for the Mobility Hub Program (account #59-70-5108).","government":{"name":"Idaho Springs","state":"CO"},"action":"contract","category":"professional-services","amount":96815,"vendor":"HDR Engineering","date":"2026-09-28","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/co/idaho-springs/meeting/167287#item-1998001"},{"title":"Task Order No. 2-26 – HDR Engineering, Inc. – Solid Waste Master Plan Phase I (SW26-0845)","government":{"name":"Pasco County","state":"FL"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-09-22","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/fl/pasco-county/meeting/200780#item-1906037"},{"title":"Approval of Amendment No. 1 to Task Order No. 12 with HDR Engineering, Inc. – Test Well No. 25","government":{"name":"Caldwell","state":"ID"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-09-08","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/id/caldwell/meeting/224399#item-2035369"},{"title":"Board approval of Task Order No. 3 with HDR Engineering, Inc. under the Standard Services Agreement (Contract No. 1202200046) in the amount of $627,350.00 for Owner Advisor Services for the Forsyth County Water Intake Contract D - Raw Water Transmission Main project - Director, Department of Capital Projects","government":{"name":"Forsyth County","state":"GA"},"action":"contract","category":"professional-services","amount":627350,"vendor":"HDR Engineering, Inc","date":"2026-09-03","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ga/forsyth-county/meeting/209482#item-2011105"},{"title":"Board to award RFP 26-59-1514 to HDR Engineering, Inc. for Right-of-Way Services on an On Call basis with approval of the associated Services Agreement – Director, Department of Capital Projects","government":{"name":"Forsyth County","state":"GA"},"action":"award","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-09-03","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ga/forsyth-county/meeting/209482#item-2011171"},{"title":"Approve a Five-Year Agreement with HDR Engineering, Inc., for On-Call Solid Waste Franchise Agreement Modernization, Procurement, and Implementation Consulting Services; Approve Task Order No. 1 for the Solid Waste Franchise Agreement Evaluation and Transition Planning in the Amount Not to Exceed $79,818; and Authorize the Board of Supervisors Chair to Sign the Agreement and Any Subsequent Task Orders (Subject to Approval as to Legal Form by County Counsel)","government":{"name":"Mariposa County","state":"CA"},"action":"contract","category":"professional-services","amount":79818,"vendor":"HDR Engineering, Inc","date":"2026-09-01","ends":"2031-09-01","ends_basis":"derived","file_no":null,"url":"https://www.docketcity.com/ca/mariposa-county/meeting/151332#item-1883315"},{"title":"Board consideration and approval of Task Order No. 3 with HDR Engineering, Inc. under the Standard Services Agreement (Contract No. 1202200046) in the amount of $627,350.00 for Owner Advisor Services for the Forsyth County Water Intake Contract D - Raw Water Transmission Main project - Director, Department of Capital Projects","government":{"name":"Forsyth County","state":"GA"},"action":"contract","category":"professional-services","amount":627350,"vendor":"HDR Engineering, Inc","date":"2026-08-25","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ga/forsyth-county/meeting/209483#item-2011111"},{"title":"ORDINANCE appropriating $1,345,099.00 out of Dedicated Drainage and Street Renewal Capital Fund-Ad Valorem Tax; approving and authorizing Professional Engineering Services Contract with HDR ENGINEERING, INC for Sunnyside Detention Basin Project; providing funding for CIP Cost Recovery relating to construction of facilities financed by the Dedicated Drainage and Street Renewal Capital Fund-Ad Valorem Tax - DISTRICT D - EVANS-SHABAZZ","government":{"name":"Houston","state":"TX"},"action":"amendment","category":"construction","amount":null,"vendor":"HDR Engineering","date":"2026-08-25","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/houston/meeting/127391#item-1861317"},{"title":"Board consideration and approval to award RFP 26-59-1514 to HDR Engineering, Inc. for Right-of-Way Services on an On Call basis with approval of the associated Services Agreement – Director, Department of Capital Projects","government":{"name":"Forsyth County","state":"GA"},"action":"award","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-08-25","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ga/forsyth-county/meeting/209483#item-2011177"},{"title":"Amendment 2 to the Public Contract for Services with HDR Engineering, Inc. for the Hilltop Road Improvement Project - Segment 2, in the Amount of $150,000.00, Douglas County Project Number CI 2020-029.","government":{"name":"Douglas County","state":"CO"},"action":"amendment","category":"professional-services","amount":150000,"vendor":"HDR Engineering, Inc","date":"2026-08-12","ends":null,"ends_basis":null,"file_no":"4967","url":"https://www.docketcity.com/co/douglas-county/legislation/4967"},{"title":"Request for approval to execute an agreement with HDR Engineering, Inc. in the amount of $154,598.00, for Professional Engineering Services in connection with Atascocita Complex - Wastewater Rehabilitation - 2024, UPIN 24035MF3JP01, Precinct 3, MWBE Contracted Goal: 19%.","government":{"name":"Harris County","state":"TX"},"action":"contract","category":"professional-services","amount":154598,"vendor":"HDR Engineering, Inc","date":"2026-08-11","ends":null,"ends_basis":null,"file_no":"26-5456","url":"https://www.docketcity.com/tx/harris-county/legislation/26-5456"},{"title":"To approve a Consultant Services Agreement with HDR Engineering, Inc., for preliminary engineering of South Cobb Transit Center, Project No. B2452, Cobb DOT Contract No. 002560.","government":{"name":"Cobb County","state":"GA"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-08-11","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ga/cobb-county/meeting/207249#item-1946538"},{"title":"Ordinance amending Ordinance No. 12251 approving Amendment No. 3 with HDR Engineering, Inc. for the 24-inch resilient water transmission main and meter vault project by increasing the contract by $17,575.00 from $310,500.00 to $328,075.00","government":{"name":"Liberty","state":"MO"},"action":"amendment","category":"professional-services","amount":328075,"vendor":"HDR Engineering, Inc","date":"2026-08-10","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/mo/liberty/meeting/297710#item-2021684"},{"title":"Consider and take appropriate action on Task Order No. 2 with HDR Engineering, Inc. for planning services for the Hilltop Water Treatment Plant, Brazos Pump Station, and Raw Water Transmission Main Project, in an amount not to exceed $400,000, and authorize the Mayor to execute the Task Order.","government":{"name":"Mineral Wells","state":"TX"},"action":"contract","category":"professional-services","amount":400000,"vendor":"HDR Engineering, Inc","date":"2026-07-21","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/mineral-wells/meeting/394111#item-2006185"},{"title":"Consider motion to approve Task Order One-Payment #9 in the amount of $3,370.52 to HDR Engineering, Inc. for services that include Professional Consulting Services.","government":{"name":"Ankeny","state":"IA"},"action":"contract","category":"professional-services","amount":3370.52,"vendor":"HDR Engineering, Inc","date":"2026-07-09","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ia/ankeny/meeting/219277#item-1931659"},{"title":"<strong><u>Resolution:</u></strong> Receive a Report, Hold a Discussion and Public Hearing, and Take Action on Authorizing the City Manager to Execute a Professional Services Contract with HDR Engineering, Inc. for PFAS Preliminary Design Services <strong><em><u>(Matthew Dane)</u></em></strong>","government":{"name":"Abilene","state":"TX"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-07-09","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/abilene/meeting/373387#item-1916090"},{"title":"Discussion, consideration, and possible action on Task Order No. 2026-04 with HDR Engineering, Inc. for the 5th and Murphy Waterline Project Construction Phase Services, authorize the City Manager, to execute the task order.","government":{"name":"Taylor","state":"TX"},"action":"contract","category":"construction","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-07-09","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/taylor/meeting/401378#item-1916886"},{"title":"Consider approval of Amendment No. 5 to Task Order No. 29 with HDR Engineering for development review and inspection services related to third-party facilities associated with the Samsung project.","government":{"name":"Taylor","state":"TX"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering","date":"2026-07-09","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/taylor/meeting/401378#item-1916888"},{"title":"Request approval of a General Services Contract with HDR Engineering, Inc., for professional engineering services. (John Crawley)","government":{"name":"Oxford","state":"MS"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-07-07","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ms/oxford/meeting/302604#item-1994908"},{"title":"Consider recommendations regarding awarding a Contract to HDR Engineering, Inc. for Construction Support Services on County Project No. 720864 Santa Claus Lane Streetscape and Coastal Access Improvements Project - Phase 2, as follows: a) Approve and authorize the Chair to execute an Agreement for Services of Independent Contractor with HDR Engineering, Inc, to provide engineering services during construction for the Santa Claus Lane Streetscape and Coastal Access Improvements Project - Phase 2, County Project No. 720864, for the period of July 14, 2026, through June 30, 2028, for an amount of $99,672.00; b) Approve and authorize the Public Works Director, or designee, to make amendments to the Agreement for additional work in an amount not to exceed $9,967.00 as set forth in Exhibit B of the Agreement, for a total not-to-exceed contract amount of $109,639.00; c) Approve and authorize the Public Works Director, or designee, to amend the Agreement to extend the Term of the Agreement by up to one year to complete the work within the scope of the Agreement; and d) Consider the environmental effects of the project as shown in the Final Mitigated Negative Declaration (19NGD-00000-00005) dated September 16, 2019, adopted by the County of Santa Barbara on September 25, 2019, and find that pursuant to California Environmental Quality Act Guidelines section 15162, no substantial changes are proposed, and there are no substantial changes in circumstances or new information of substantial importance regarding significant impacts or feasibility of mitigation measures and alternative, and therefore approval of the Recommended Actions are within the scope of the Final Mitigated Negative Declaration (19NGD-00000-00005).","government":{"name":"Santa Barbara County","state":"CA"},"action":"award","category":"construction","amount":9967,"vendor":"HDR Engineering, Inc","date":"2026-07-02","ends":"2028-06-30","ends_basis":"stated","file_no":"26-00683","url":"https://www.docketcity.com/ca/santa-barbara-county/legislation/26-00683"},{"title":"Dept/ Agency: Water and Sewer Utilities Action: (X) Ratifying (X) Authorizing ( ) Amending Type of Service: Professional Services Contract Purpose: To provide professional engineering services for Combined Sewer Overflow General Permit Support and Tier “A” Municipal Stormwater General Support Entity Name: HDR Engineering, Inc. Entity Address: One Riverfront Plaza, 14th Floor, Newark, New Jersey 07102 Contract Amount: Not to Exceed $377,429.00 Funding Source: 2026 Budget/Department of Water and Sewer Utilities/Business Unit: NW038, Dept. 800, Div./Proj. 8003, Activity A, Account #71240, Budget Ref: B2026 Contract Period: April 1, 2026 to March 31, 2027 Contract Basis: ( ) Bid ( ) State Vendor (X) Prof. Ser. ( ) EUS ( ) Fair & Open (X) No Reportable Contributions ( ) RFP ( ) RFQ ( ) Private Sale ( ) Grant ( ) Sub-recipient ( ) N/A Additional Information:","government":{"name":"Newark","state":"NJ"},"action":"amendment","category":"professional-services","amount":377429,"vendor":"HDR Engineering, Inc","date":"2026-07-01","ends":"2027-03-31","ends_basis":"stated","file_no":"26-0991","url":"https://www.docketcity.com/nj/newark/legislation/26-0991"},{"title":"Resolution to approve Amendment to Agreement for Engineering Services with HDR Engineering, Inc. ​","government":{"name":"Polk County","state":"IA"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-30","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ia/polk-county/meeting/224723#item-1904445"},{"title":"Approve and authorize Amendment No. 6 to Agreement No. 220223B (FC) with HDR Engineering, Inc., increasing the maximum from $17,846,772 to a new total of $18,138,826. (Fiscal Impact: $292,054 Expense, Flood Project; Budgeted; Discretionary)","government":{"name":"Napa County","state":"CA"},"action":"amendment","category":"professional-services","amount":18138826,"vendor":"HDR Engineering, Inc","date":"2026-06-25","ends":null,"ends_basis":null,"file_no":"26-1372","url":"https://www.docketcity.com/ca/napa-county/legislation/26-1372"},{"title":"Receive a presentation from HDR Engineering providing an update on Task Order 45 for the Lead Service Line Inventory Development Support project.","government":{"name":"Taylor","state":"TX"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering","date":"2026-06-25","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/taylor/meeting/401383#item-1916891"},{"title":"Supplemental Agreement No. 8 to the Professional Services Agreement with HDR Engineering, Inc. for the 88th ST NE Corridor Improvement Project","government":{"name":"Marysville","state":"WA"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-22","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/wa/marysville/meeting/419829#item-1962593"},{"title":"Resolution authorizing the City Manager to execute a Task Order with HDR Engineering, Inc. for engineering services related to flood mitigation alternatives in the amount of $298,700.00","government":{"name":"Wichita Falls","state":"TX"},"action":"contract","category":"professional-services","amount":298700,"vendor":"HDR Engineering, Inc","date":"2026-06-16","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/wichita-falls/meeting/402498#item-2033872"},{"title":"Amendment No. 2 – HDR Engineering, Inc. (Landfill Gas Operations & Maintenance), Contract No. 22249","government":{"name":"Rowan County","state":"NC"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-15","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/nc/rowan-county/meeting/316915#item-2028938"},{"title":"Amendment No. 2 – HDR Engineering, Inc. (General Services & Planning Support), Contract No. 22248","government":{"name":"Rowan County","state":"NC"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-15","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/nc/rowan-county/meeting/316915#item-2028939"},{"title":"Discussion, consideration, and possible action for approval of Amendment No.5 to the Agreement for Engineering Services for mitigation projects with HDR Engineering and use of Texas Water Development Board Flood Infrastructure Fund Loan and City Funds.","government":{"name":"Taylor","state":"TX"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering","date":"2026-06-11","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/taylor/meeting/401390#item-1916780"},{"title":"Seventh Amendment to Agreement with HDR Engineering, Inc. for Additional Design Services - Bridge Replacement at Las Posas Road and Ventura Boulevard Project No. SD-5052 (City)","government":{"name":"Camarillo","state":"CA"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-10","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ca/camarillo/meeting/109334#item-2045386"},{"title":"Approval of Professional Services Agreement with HDR Engineering, Inc. for the City of Valdez Baler Replacement Project in the Amount of $326,466.00","government":{"name":"Valdez","state":"AK"},"action":"contract","category":"professional-services","amount":326466,"vendor":"HDR Engineering, Inc","date":"2026-06-09","ends":null,"ends_basis":null,"file_no":"26-0250","url":"https://www.docketcity.com/ak/valdez/legislation/26-0250"},{"title":"Resolution authorizing the execution of Supplemental Agreement No. 1 to the Professional Services Agreement (PO# 2450214) with HDR Engineering, Inc. in the amount of $1,500,000, plus all applicable taxes.","government":{"name":"Bellevue","state":"WA"},"action":"amendment","category":"professional-services","amount":1500000,"vendor":"HDR Engineering, Inc","date":"2026-06-05","ends":null,"ends_basis":null,"file_no":"RES 10654","url":"https://www.docketcity.com/wa/bellevue/legislation/res-10654"},{"title":"A Resolution of the Town Council of the Town of Erie Approving a Fourth Amendment to Construction Contract with HDR Engineering, Inc., for the Erie Lake Dam Seepage Rehabilitation Investigation, Analysis, and Design","government":{"name":"Erie","state":"CO"},"action":"amendment","category":"construction","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-03","ends":null,"ends_basis":null,"file_no":"2026-374","url":"https://www.docketcity.com/co/erie/legislation/2026-374"},{"title":"Short Form Agreement with HDR Engineering, Inc. for the West Yellowstone Avenue Pedestrian Improvements Project","government":{"name":"Cody","state":"WY"},"action":"contract","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-06-02","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/wy/cody/meeting/441176#item-2007864"},{"title":"A resolution approving a proposed Contract between the City and County of Denver and HDR ENGINEERING, INC. to complete a comprehensive assessment of the Welton Street Corridor that will develop recommendations for transportation, in Council District 9. Approves contract with HDR ENGINEERING, INC. for $964,000.00 with an end date of 6-1-2028 to complete a comprehensive assessment of the Welton Street Corridor that will develop recommendations for transportation, in Council District 9 (DOTI-202684614). The last regularly scheduled Council meeting within the 30-day review period is on 6-29-2026. The Committee approved filing this item at its meeting on 6-3-2026.","government":{"name":"Denver","state":"CO"},"action":"contract","category":"professional-services","amount":964000,"vendor":"HDR Engineering","date":"2026-05-22","ends":null,"ends_basis":null,"file_no":"26-0739","url":"https://www.docketcity.com/co/denver/legislation/26-0739"},{"title":"Consider motion to approve Amendment No. 2 to the Professional Services Agreement increasing the contract amount by $64,955.00 with HDR Engineering, Inc. (HDR) for construction services on the NW Irvinedale Drive Elevated Water Storage project.","government":{"name":"Ankeny","state":"IA"},"action":"amendment","category":"professional-services","amount":64955,"vendor":"HDR Engineering, Inc","date":"2026-05-18","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/ia/ankeny/meeting/219291#item-1931573"},{"title":"Discussion, consideration, and possible action regarding updates to the 2022 and 2024 Street Maintenance Projects, approval of Change Order No. 3 with HDR Engineering, Inc., and direction on 2025 Davis Street striping configuration options.","government":{"name":"Taylor","state":"TX"},"action":"amendment","category":"construction","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-05-14","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/taylor/meeting/401401#item-1916929"},{"title":"A resolution approving a proposed Agreement between the City and County of Denver and HDR ENGINEERING, INC. for on-call airside and landside infrastructure professional design and engineering services at Denver International Airport. Approves a contract with HDR Engineering Inc for $8,000,000 and for five years for on-call airside and landside infrastructure professional design and engineering services at Denver International Airport, in Council District 11 (PLANE-202582716). The last regularly scheduled Council meeting within the 30-day review period is on 6-22-2026. The Committee approved filing this item at its meeting on 5-20-2026.","government":{"name":"Denver","state":"CO"},"action":"contract","category":"professional-services","amount":8000000,"vendor":"HDR Engineering Inc","date":"2026-05-11","ends":null,"ends_basis":null,"file_no":"26-0673","url":"https://www.docketcity.com/co/denver/legislation/26-0673"},{"title":"Council action is requested to authorize the City Manager to approve Change Order #1 to the existing design services contract (PO#26000601) with HDR Engineering, Inc., for a revised contract amount not to exceed $721,345, and authorizing change orders up to ten percent (10%) of the authorized amount, for additional engineering services as part of the Upper Adair Interceptor Project (No. 302201). Approved","government":{"name":"Independence","state":"MO"},"action":"amendment","category":"professional-services","amount":721345,"vendor":"HDR Engineering, Inc","date":"2026-05-04","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/mo/independence/meeting/298694#item-1884816"},{"title":"Consider authorizing the Second Amendment to the Professional Services Agreement with HDR Engineering, Inc., for the Blackhawk Boulevard Reconstruction Phase II Repackage C Project to design parallel street parking along Blackhawk Boulevard and to incorporate su​​​​​ch design into the reconstruction project.","government":{"name":"Friendswood","state":"TX"},"action":"amendment","category":"professional-services","amount":null,"vendor":"HDR Engineering, Inc","date":"2026-05-04","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/tx/friendswood/meeting/383948#item-1888037"},{"title":"Amendment 1 to Public Contract for Services with HDR Engineering, Inc. for Design Services During Construction on the Hilltop Road Improvement Project, for an Additional $24,837.00, Which Takes the Original Contract Amount over $100,000.00, Requiring Board of County Commissioners Approval; and will Also Extend the Expiration Date of the Contract Through June 30, 2027; Douglas County Project Number CI 2020-029.","government":{"name":"Douglas County","state":"CO"},"action":"amendment","category":"professional-services","amount":100000,"vendor":"HDR Engineering, Inc","date":"2026-04-29","ends":"2027-06-30","ends_basis":"stated","file_no":"4664","url":"https://www.docketcity.com/co/douglas-county/legislation/4664"},{"title":"Request board approve an amendment of the contract with HDR Engineering. This extension amounts to $15,000. This amendment covers the additional costs for a weekly update meeting with the Chief Public Works Officer and the Manager of RSID 8901.","government":{"name":"Missoula County","state":"MT"},"action":"amendment","category":"professional-services","amount":15000,"vendor":"HDR Engineering","date":"2026-04-28","ends":null,"ends_basis":null,"file_no":null,"url":"https://www.docketcity.com/mt/missoula-county/meeting/307302#item-1867860"},{"title":"Request for approval to execute an agreement with HDR Engineering, Inc. in the amount of $1,160,565.81 for Professional Engineering and related services in connection with Design Phase Services of Holderrieth Rd Segment 4 - from Sir Alex Dr to SH 99 - 2025, UPIN 25103MF3VP01, Precinct 3, MWBE Contracted Goal 2.77%.","government":{"name":"Harris County","state":"TX"},"action":"contract","category":"professional-services","amount":1160565.81,"vendor":"HDR Engineering, Inc","date":"2026-04-21","ends":null,"ends_basis":null,"file_no":"26-2764","url":"https://www.docketcity.com/tx/harris-county/legislation/26-2764"}]}